PUBLIC WORKS PROJECTS
Since 2009 - We stand behind our work.
Public Works Projects
- Client
- City of Longview Public Works
- Date
- March 25, 2024
- Website
- View website
The Hope Park Project involved: site improvements such as all new sanitary sewer services, water services, stormwater facilities/filtration, privacy fencing, electrical services, site grading and asphalt patching. These improvements prepared The City of Longview's Parcel of 60+ Pallet Homes to be installed, alongside providing a better, more clean environment for the unsheltered individuals.- Client
- City of Longview Public Works
- Date
- March 13, 2024
- Website
- View website
The water work portion of the project included the construction of 5,372 lineal feet of 10-inch ductile iron Pipe, 489 lineal feet of 8-inch ductile iron pipe, 125 lineal feet of 6-inch ductile iron pipe, over 100 miscellaneous fittings and valves, 76 service transfers, over 2,500 tons of asphalt, as well as traffic control and other miscellaneous items required to complete the project. The sanitary sewer portion of the work included 495 lineal feet of 8-inch sanitary sewer main line that had an average bury depth of 11 feet, installation of associated manholes, demolition and restoration for all disturbed areas.- Client
- City of Longview Public Works
- Date
- March 12, 2024
- Website
- View website
This project included clearing and grubbing, shoring, excavation, construction and removal of a temporary traffic bypass, temporary creek diversion, removal of existing culverts, installation of Contracting Agency supplied 18-foot span precast concrete box culvert and 14-foot span precast concrete box culvert, roadway reconstruction, riprap placement and seeding and mulching.- Client
- City of Longview Public Works
- Date
- March 12, 2024
- Website
- View website
Nichols Blvd. consisted of planning the existing asphalt concrete pavement to expose the existing Portland concrete pavement, where present, or existing aggregate base and create a uniform surface with HMA. This included manhole work, catch basins, working with irregular curbs, excavation, grading and compaction of the base according to plans.- Client
- City of Longview Public Works
- Date
- February 12, 2024
- Website
- View website
The project included four acres of clearing & grubbing, 8,800 Cubic Yards of roadway excavation, 3,100 Cubic Yards of excavation for four stormwater facilities, 5,000+ LF of utility line installation (Water, Sewer, Storm), 47 precast structures, 880 LF of Joint Utility Trenching & Coordination which contained services from NW Natural, Comcast, Lumen, City of Ridgefield, and Clark Public Utilities. The project also consisted of roundabout construction, which contained 3,590 SY of textured and pigmented concrete, 5,400 LF of concrete curb, 2,050 SY of sidewalk, 16 Curb Ramps, 300 basalt columns, four decorative landscape walls with lettering, 3,000 tons of asphalt, a traffic signal system in the intersection of S 5th St & S Union Ridge, a rectangular rapid flashing beacon system at crosswalks, installation of an illumination system at the roundabout & intersection, 2,500+ plants were planted, over an acre of ground was seeded, and 1,700+ LF of fencing was installed.- Client
- City of Longview Public Works
- Date
- February 12, 2024
- Website
- View website
The project consisted of improving the parking, circulation and safety for vehicles and pedestrians at Tam O’Shanter Park by widening and paving parking lots, addition of a two-way bypass road, rehabilitation of existing roads and parking areas, constructing sidewalk, concrete walkways, restoration of portions of the existing baseball field, stormwater management facilities, installing boulders, fencing, striping, wheel stops, compost berms, topsoil, grass seed, landscaping and lighting.- Client
- City of Longview Public Works
- Date
- February 12, 2024
- Website
- View website
The project included 6 lane running tracks with irrigation and field improvements at both Huntington Middle School and Coweeman Middle School.- Client
- City of Longview Public Works
- Date
- January 16, 2023
- Website
- View website
This project included clearing and grubbing, shoring, excavation, construction and removal of a temporary traffic bypass, temporary creek diversion, removal of existing culverts, installation of Contracting Agency supplied 18-foot span precast concrete box culvert and 14-foot span precast concrete box culvert, roadway reconstruction, riprap placement and seeding and mulching.- Client
- City of Longview Public Works
- Date
- January 16, 2023
- Website
- View website
This project included clearing and grubbing, shoring, excavation, construction and removal of a temporary traffic bypass, temporary creek diversion, removal of existing culverts, installation of Contracting Agency supplied 18-foot span precast concrete box culvert and 14-foot span precast concrete box culvert, roadway reconstruction, riprap placement and seeding and mulching.- Client
- City of Longview Public Works
- Date
- August 21, 2020
- Website
- View website
This project included clearing and grubbing, shoring, excavation, construction and removal of a temporary traffic bypass, temporary creek diversion, removal of existing culverts, installation of Contracting Agency supplied 18-foot span precast concrete box culvert and 14-foot span precast concrete box culvert, roadway reconstruction, riprap placement and seeding and mulching.- Client
- City of Longview Public Works
- Date
- August 21, 2020
- Website
- View website
This project consisted of upgrading the two running tracks through demolition of existing structures, earthwork, placement and compaction of rock, concrete curbs, drainage improvements, asphalt pavement and associated work to prepare for others to deliver the rubberized sports surfacing.- Client
- City of Longview Public Works
- Date
- August 21, 2020
- Website
- View website
The reconstruction of West Main Street between in Kelso included sidewalk and pavement removal and replacement, storm sewer installation, waterline and sanitary sewer replacement, rain garden construction and planting, traffic signal modification and other minor work.