NE 49th Street Water Main Replacement
City of Vancouver
The water work portion of the project included the construction of 5,372 lineal feet of 10-inch ductile iron Pipe, 489 lineal feet of 8-inch ductile iron pipe, 125 lineal feet of 6-inch ductile iron pipe, over 100 miscellaneous fittings and valves, 76 service transfers, over 2,500 tons of asphalt, as well as traffic control and other miscellaneous items required to complete the project. The sanitary sewer portion of the work included 495 lineal feet of 8-inch sanitary sewer main line that had an average bury depth of 11 feet, installation of associated manholes, demolition and restoration for all disturbed areas.